Full Project Audit Report — TechTown Acoustics 2.0

Date: 2026-03-04 | Auditor: Claude (Opus 4.6) | Requested by: Obai

Audit Scope

Per user request: audit and review the entire project folder — verify all files are self-contained, all technical data is correct, all source files are inside the working directory, and identify any discrepancies.


1. File Organization Audit

Root Directory (AFTER cleanup)

ItemTypeStatus
PROJECT-INDEX.htmlNavigation pageCLEAN
12 subdirectoriesProject structureCLEAN
Prompts for Reference...READ-ONLY LLM textsUNCHANGED

Files Moved to Source/ (this audit)

Original Location (Root)New Location (Source/)Size
All Floor - Only Yellow concerned.pngSource/2026-03-04_All-Floor-Yellow-Zone.png1.13 MB
B3.pngSource/2026-03-04_B3-Yellow-Zone-Dimensions.png56 KB
SD-HVAC-ALL-241225-V02_new.dxfSource/2026-03-04_v01_HVAC-All-Floors.dxf39 MB
Techtown...layout...2026_new.dxfSource/2026-03-04_Furniture-Layout-ODA-Converted.dxf6.87 MB

Result: Root is now clean. All source files properly archived with date-prefixed naming.

Source/ Folder Contents (5 files)

FileSizeRoleStatus
2026-03-04_Furniture-Layout-Original-AutoCAD.dxf7.70 MBArchitect's native (Sarah)AUTHORITATIVE
2026-03-04_Furniture-Layout-ODA-Converted.dxf6.87 MBObai's ODA conversionSUPERSEDED
2026-03-04_v01_HVAC-All-Floors.dxf39 MBHVAC drawing — all floorsACTIVE
2026-03-04_All-Floor-Yellow-Zone.png1.13 MBFull floor plan referenceREFERENCE
2026-03-04_B3-Yellow-Zone-Dimensions.png56 KBDimensioned B3 planREFERENCE

External References Check

PASS — No files reference paths outside D:\Projects\Special\TechTown\Acoustics2.0\. All file references in HTML reports use relative paths.


2. DXF Version Clarification

Two furniture DXFs exist — this caused confusion during the session:

PropertyOriginal AutoCAD (Sarah)ODA Converted (Obai)
FileFurniture-Layout-Original-AutoCAD.dxfFurniture-Layout-ODA-Converted.dxf
Size7.70 MB6.87 MB
Entities25,27421,727
Layers3844
Saved by"sarah" (architect)"obai"
FormatDirect AutoCAD exportODA File Converter export
Annotations131 DIMENSION entities102 DIMENSION entities
Extra layers7 - Furniture - Custom, Customized Furniture Codes

Structural geometry is IDENTICAL between both files. All wall coordinates and column positions match exactly. The Sarah file is the authoritative source.

Important: The furniture DXF contains ZERO HVAC layers. All HVAC data is exclusively in the dedicated HVAC DXF.


3. Stale Data Identified

CRITICAL: Locked Scope v01 — 6 Stale Values

Scope/2026-03-04_v01_Locked-Scope.html was created BEFORE the user shared cross-session data. The following values are now outdated:

LocationCurrent Value (WRONG)Correct ValueSource of Correction
Line ~72Ceiling: 290 cm350 cm (to concrete slab)User cross-session data
Line ~87Control Room: NC-20NC-25User cross-session data
Line ~88Video/Podcast: NC-20NC-25User cross-session data
Line ~135Samsung DVM VRFDaikin VRFHVAC contractor confirmation
Line ~165Samsung DVM specs (assumption)Daikin specsHVAC contractor confirmation
Line ~188Buffer spine: NOT SELECTEDREQUIREDUser cross-session data

Action Required: Create Scope/2026-03-04_v02_Locked-Scope.html with all corrections applied.

MODERATE: Phase 1 Geometry Report — Volume Calculation

Reports/2026-03-04_v01_Phase-1-Geometry-Report.html

SectionCurrent Value (OLD)Correct Value
Volume (raw)84.5 m³ (29.13 × 2.90)101.9 m³ (29.13 × 3.50)
Volume (effective)75.7 m³ (29.13 × 2.60)91.8 m³ (29.13 × 3.15)

The area calculation (29.13 m²) remains valid. Only the volume section is affected by the ceiling height change.

MODERATE: Area Calculation Working Notes

Calculations/2026-03-04_v01_Area-Calculation.md

Lines 344-349 use 2.9m ceiling for volume calculation — same issue as above.

LOW: Project Analysis Report — Historical Samsung DVM References

Reports/2026-03-04_Project-Analysis-Report.html

Multiple references to "Samsung DVM VRF" and "290 cm" ceiling in the Phase 0 analysis report. Since this is a historical document recording the state at the START of the session (before corrections), these can be left as-is. However, they should NOT be used as reference values.

Recommendation: Add a banner noting this is a Phase 0 historical document with superseded values.


4. Technical Data Cross-Check

Geometry (ALL VERIFIED CORRECT)

ParameterValueVerified In
South wall (E-W)7.37 m (737 cm)DXF, B3.png, all reports
North wall (E-W)~6.15 m (614.8 cm)Calculated from diagonal
East wall (N-S)4.31 m (431 cm)DXF, B3.png, all reports
NW diagonal4.48 m (448 cm)DXF, B3.png, all reports
Diagonal horiz. component1.22 m (122.2 cm)Calculated: √(448² - 431²)
Gross area29.13 m²½ × (737 + 614.8) × 431
ShapeRight trapezoidConfirmed in DXF

Columns (VERIFIED CORRECT)

ColumnPosition (center)SizeNotes
COL-1(3.95, 1.36)60 × 50 cmInterior, mid-zone
COL-2(~7.10, 1.36)~55 × 50 cmAgainst east wall

Width Formula (VERIFIED CORRECT)

W = 7.37 - (Y / 4.31) × 1.22 — checked at Y=0 (gives 7.37) and Y=4.31 (gives 6.15).

HVAC Equipment (VERIFIED CORRECT)

FindingValueStatus
System typeDaikin VRFConfirmed by contractor
Unit inside zoneU380 near SE corner (~6.88, 0.50)From HVAC DXF analysis
Units outside zoneU370/U371 (~2.7m east), U328 (~10m east)From HVAC DXF analysis
Coordinate transformationHVAC_X = Furniture_X × 1000 + 203,000Derived from reference blocks
Diffusers inside zone1 (barely) at ~1.73m eastMost are OUTSIDE to the west

NC/RT60/STC Targets (CURRENT CORRECT VALUES)

RoomNCRT60 (s)STC
VO Live RoomNC-150.15–0.2558–68 (perimeter + server wall)
Control RoomNC-250.30–0.40
Video/PodcastNC-250.25–0.40
EditingNC-30–35≤ 0.50

5. File Inventory (Complete)

Reports/ (3 files)

  1. 2026-03-04_Project-Analysis-Report.html — Phase 0 analysis (HISTORICAL)
  2. 2026-03-04_v01_Phase-1-Geometry-Report.html — Phase 1 geometry (volume needs update)
  3. 2026-03-04_v01_Phase-2-Layout-Options.html — Phase 2 layouts (CURRENT, awaiting Q1-Q6)

Scope/ (1 file)

  1. 2026-03-04_v01_Locked-Scope.html — v01 scope (6 STALE VALUES — needs v02)

Calculations/ (1 file)

  1. 2026-03-04_v01_Area-Calculation.md — Area calc (volume section needs update)

HVAC/ (4 files)

  1. 2026-03-04_v01_HVAC-Coordination-Log.md — VERIFIED CORRECT
  2. 2026-03-04_v01_HVAC-Equipment-Map.md — VERIFIED CORRECT
  3. 2026-03-04_v01_B3-Zone-Map-HVAC.html — VERIFIED CORRECT
  4. 2026-03-04_v01_Zone-Numbers-For-Gemini.md — VERIFIED CORRECT

LOG/ (3 files)

  1. CHANGELOG.md — VERIFIED CORRECT (14 entries)
  2. 2026-03-04_Session-Log.md — CREATED this audit
  3. 2026-03-04_Audit-Report.md — THIS FILE

Source/ (5 files)

All source files verified present and correctly named (see Section 1).

Empty Folders (awaiting future phases)

BOM/, Charts/, Construction-Guides/, DXF-Output/, Layouts/, Questions/


6. PROJECT-INDEX Updates (This Audit)


7. Recommended Next Actions

Immediate (Before Continuing Design Work)

  1. Create Locked Scope v02 — Apply all 6 corrections from Section 3
  2. Get user answers to Phase 2 Q1-Q6 — Layout selection is blocking Phase 3

Short-Term

  1. Annotate Phase 0 Analysis Report — Add banner: "Historical document — superseded values exist"
  2. Update Phase 1 volume calculation — Either annotate v01 or create v02 with 3.5m ceiling

Pending External Actions

  1. HVAC team needs updated floor plan from Sarah (architect)
  2. HVAC team to confirm airflow (CFM/L/s) for MediaVerse area
  3. HVAC team to provide Daikin model numbers for noise data sheets
  4. HVAC team to confirm silencer fitment in 60 cm ceiling space
  5. HVAC team to confirm indoor unit mounting method

8. Audit Conclusion

Overall project state: SOUND with corrections needed.

The project foundation is solid. The stale data stems from a single event: scope updates received mid-session from the user's parallel LLM work. All files created AFTER that update (Phase 2, HVAC docs) correctly reflect the new values. Only files created BEFORE the update (Scope v01, Phase 1, Area Calc) contain outdated ceiling/NC/VRF values.


Audit completed 2026-03-04. This report is part of the project audit trail.