TechTown Acoustics 2.0 — CHANGELOG

Versioning Convention

Folder Structure

FolderPurpose
Reports/All HTML analysis & findings reports
Calculations/Acoustic engineering calculations (RT60, NC, STC, modal)
Charts/Visual diagrams, charts, frequency plots
Construction-Guides/Step-by-step build instructions per area
BOM/Bill of Materials with local + import sources
DXF-Output/Generated contractor-ready DXF drawings
HVAC/HVAC noise analysis & silencer schedules
Scope/Locked scope documents (versioned)
LOG/This changelog + session logs
Questions/HTML question files (to user & to client)
Layouts/Room layout options & spatial plans
Source/Reserved for processed/extracted source data
Prompts for Reference...Original LLM reference texts (READ ONLY)

[2026-03-04 03:46] v01 — Project Analysis Report

  • File: Reports/2026-03-04_Project-Analysis-Report.html
  • Author: Claude (Opus 4.6)
  • Action: Created initial project analysis report
  • Contents: File inventory, scope analysis, physical constraints, LLM discrepancy comparison, 10 questions for user, LLM assessment, agreed facts, risks, HVAC summary, next steps
  • Status: DELIVERED — Awaiting user answers

[2026-03-04 04:16] v01 — Project Infrastructure

  • Action: Created professional folder structure (12 folders)
  • Folders: BOM, Calculations, Charts, Construction-Guides, DXF-Output, HVAC, Layouts, LOG, Questions, Scope, Source
  • Convention: All files versioned with YYYY-MM-DD_vNN_Title.ext

[2026-03-04 04:16] — User Answers Received

  • Action: User provided answers to all 10 questions from Analysis Report
  • Key decisions:
    • Q1: Yellow area ONLY (~32-39 m², exact TBD)
    • Q2: 4 SEPARATE rooms (Live, Control, Video/Podcast, Editing)
    • Q3: Control must see Live Room; Video Studio sight line nice-to-have
    • Q4: 4 editing workstations
    • Q5: Conservative / broadcast-grade NC targets
    • Q6: v1.0 lost context from cross-LLM edits — fresh start
    • Q7: No firm budget — design best, then cost it
    • Q8: ALL 6 deliverables + construction how-to guides with charts
    • Q9: Assume worst-case server room noise (55-65 dB(A))
    • Q10: Assume worst-case glazing
  • Agreed Facts: All 15 confirmed
  • Support Features: Sound lock confirmed (in agreed facts); buffer spine NOT selected

[2026-03-04 04:16] — Phase 1 Started: Geometry & Area

  • Action: DXF layer extraction, dimension verification, independent area calculation
  • Furniture DXF: 21,727 entities, 44 layers — key layers: 1 - Existing Wall, A-WALL, Boundry, COLUMNS & STRUCTURE, column, column-L
  • HVAC DXF: 72,677 entities, 137 layers — key HVAC layers: Duct, MECH-Supply Duct, MECH-Indoor unit, VI-AIR DEVICES, etc.
  • All 9 dimension values from B3.png confirmed present in DXF: 334, 737, 270, 431, 448, 111, 333, 233, 727

[2026-03-04 04:30] v01 — Locked Scope Document

  • File: Scope/2026-03-04_v01_Locked-Scope.html
  • Author: Claude (Opus 4.6)
  • Action: Created locked scope document with all confirmed parameters
  • Contents: Project identity, scope boundary, room program (4 rooms + sound lock), NC/RT60/STC targets, physical constraints, HVAC system, construction specs, assumptions, deliverables checklist, sign-off section
  • Status: DELIVERED — Awaiting sign-off

[2026-03-04 04:30] v01 — Phase 1 Geometry Report

  • File: Reports/2026-03-04_v01_Phase-1-Geometry-Report.html
  • Author: Claude (Opus 4.6)
  • Action: Completed independent geometry analysis
  • Key findings:
    • Yellow zone shape: TRAPEZOID (not rectangle) due to angled NW facade
    • Diagonal wall: 448 cm → horizontal component 122.2 cm
    • Interior area: ~29.13 m² (trapezoid formula)
    • Volume: ~84.5 m³ raw, ~75.7 m³ effective
    • Usable after construction: ~24-26 m²
    • All 9 B3.png dimensions verified in DXF
    • 8+ columns found in DXF across B3 — 2 inside yellow zone
    • DXF Boundry layer inadequate (1 entity only)
    • Wall geometry on 1 - Existing Wall layer (38 entities)
  • DXF coordinate data extracted: Wall hatch vertices, column positions with sizes
  • 5 questions posed to user for verification
  • Status: DELIVERED — Awaiting user answers

[2026-03-04 04:30] v01 — Area Calculation Working Notes

  • File: Calculations/2026-03-04_v01_Area-Calculation.md
  • Author: Claude (Opus 4.6)
  • Action: Detailed step-by-step area calculation with trigonometry, cross-references, and verification checklist

[2026-03-04 04:30] — Project Index Created

  • File: PROJECT-INDEX.html (root level)
  • Action: Master navigation page for all project deliverables, phase roadmap, folder guide, versioning convention

[2026-03-04 05:00] — New DXF Received & Compared

  • Source: Techtown Building office_ B3 Final Furniture layout 03.03.2026 (1).dxf (from architect)
  • Archived to: Source/2026-03-04_Furniture-Layout-Original-AutoCAD.dxf
  • Comparison Results:
    • New file: 7.7 MB, 25,274 entities, 38 layers, saved by "sarah" (architect), direct AutoCAD export
    • Old file: 6.9 MB, 21,727 entities, 44 layers, saved by "obai", ODA File Converter export
    • Structural geometry: IDENTICAL — all wall coordinates, column positions match exactly
    • New file has +3,547 entities, +29 DIMENSION annotations (131 vs 102)
    • Old file has 2 extra layers (7 - Furniture - Custom, Customized Furniture Codes) — custom additions
    • New file is architect's native AutoCAD save (ACADMAINTVER 197) — more complete annotation set
  • Conclusion: No changes to calculations needed. Both files represent same geometry. New file archived as authoritative source.
  • Status: COMPLETE — No impact on Phase 1 results

[2026-03-04 05:30] — User Provided Cross-Session Data

  • Source: User shared notes from a parallel LLM session
  • Key updates to scope:
    • Ceiling height REVISED: 3.5 m to concrete slab (2.9 m was gypsum board, removable)
    • Volume REVISED: Raw = 29.13 × 3.5 = 101.9 m³; Effective = 29.13 × 3.15 = 91.8 m³
    • Buffer spine/corridor: NOW REQUIRED (previously "not selected")
    • NC targets refined: NC-15 (VO Live), NC-25 (Control), NC-25 (Video/Podcast), NC-30–35 (Editing)
    • RT60 refined: VO 0.15–0.25 s, Video 0.25–0.40 s, Editing ≤ 0.50 s
    • STC targets: STC 58–68 for VO perimeter and server-room wall
    • VO Live Room expanded scope: 2–3 vocalists + soft acoustic instrument (not just solo VO)
    • Green screen: Motorized/retractable, 10–30 cm air gap + absorption behind track
    • Full demo: All existing internal gypsum/glass partitions must be demolished
    • Workflow confirmed: Entry (south) → Editing → Video/Podcast → Control → Live (noise gradient)
    • Option A (N-S green screen) identified as safest orientation
    • Construction: Can remove gypsum ceiling to access full 3.5 m slab height (ducts above)
  • Impact: Scope v02 needed; Phase 2 layout planning can proceed
  • Status: LOGGED — Proceeding to Phase 2

[2026-03-04 05:30] — Phase 2 Started: Layout Options

  • Action: Creating 3 room layout options with SVG floor plans, area allocation, acoustic analysis
  • Parameters used: Updated ceiling (3.5 m), buffer spine required, refined NC/RT60 targets
  • Critical constraint: ~29 m² for 5 zones — VERY tight, trade-offs required

[2026-03-04 05:45] v01 — Phase 2 Layout Options Report

  • File: Reports/2026-03-04_v01_Phase-2-Layout-Options.html
  • Author: Claude (Opus 4.6)
  • Action: Created 3 room layout options with SVG floor plans
  • Contents:
    • Updated parameters table (ceiling 3.5 m, buffer spine, refined NC/RT60)
    • Space constraint analysis (29 m² gross → 19-22 m² usable room area)
    • Option A: "Dual Zone + Central Spine" — N-S buffer, VO west, production east (RECOMMENDED)
    • Option B: "L-Wrap" — E-W buffer, wider control room but shallow south rooms
    • Option C: "Maximum Live Room" — largest VO booth (7.8 m²), sacrifices video room
    • Comparison matrix across 13 criteria
    • Preliminary modal analysis (Live Room axial modes, Schroeder frequency ~210 Hz)
    • 6 questions for layout selection (interactive radio + textarea with localStorage)
  • Critical finding: Area deficit of 35-46% — every room below ideal minimum
  • Recommendation: Option A for best overall balance; Option C if ensemble recording is priority
  • Status: DELIVERED — Awaiting layout selection (Q1-Q6)

[2026-03-04 05:45] — PROJECT-INDEX Updated

  • Action: Added Phase 2 report link, updated progress bar to Phase 2/6, marked Phase 1 COMPLETE

[2026-03-04 06:15] — HVAC Coordination Log (Obai ↔ HVAC Contractor)

  • Type: Client-to-contractor communication log
  • System confirmed: Daikin VRF (not Samsung DVM as previously assumed — SCOPE CORRECTION)
  • Key points from Obai's initial message to HVAC team:
    1. Ceiling going back to 3.5 m concrete slab
    2. Full room-within-a-room for VO studio, target NC-15
    3. Existing metal ducts are "speaking tubes" — linear slots won't hold isolation
    4. Integration plan proposed:
      • Cut supply/return in external buffer spine
      • Install inline acoustic silencers (baffle boxes) before duct wall penetrations
      • Inside VO: drop hard pipe → flexible acoustic ducting in S-curve (break line-of-sight)
      • Terminal velocity at diffusers: strictly < 1.5 m/s (critical for mic sensitivity)
    5. Questions to HVAC team:
      • Can we oversize final drops + expanded acoustic plenum boxes for 1.5 m/s?
      • What inline silencers fit in 60 cm drop ceiling space?
      • Are indoor units hard-mounted to slab? Need neoprene vibration isolators?
      • Can routing keep noisy branch lines in east buffer corridor (not crossing live room)?
      • Request to review routing on updated floor plan
  • HVAC contractor response:
    1. Didn't understand "division" point → Obai clarified (intercept duct, not remove AC)
    2. System is Daikin VRF — needs complete floor plan to confirm airflow assignment
    3. Difficult to change at this stage — system already customized to previous design
  • Obai's clarification:
    • NOT redesigning VRF system, tonnages, or main piping
    • Only modifying "last mile" of air delivery
    • Indoor VRF unit sits OUTSIDE critical rooms (corridor or editing area)
    • From there: oversize final drops → acoustic plenum boxes → velocity ≤ 1.5 m/s
    • Just adjusting last stretch of ductwork
  • Impact on project:
    • SCOPE CORRECTION: HVAC system is Daikin VRF, NOT Samsung DVM VRF
    • HVAC contractor willing to coordinate but needs updated floor plan
    • "Last mile" modification approach confirmed feasible in principle
    • Silencer sizing, plenum box dimensions, and duct routing TBD pending floor plan review
  • Status: ACTIVE — Awaiting HVAC team review of updated floor plan

[2026-03-04 06:30] — HVAC DXF Archived & Equipment Map Created

  • Source: SD-HVAC-ALL-241225-V02_new.dxf (root)
  • Archived to: Source/2026-03-04_v01_HVAC-All-Floors.dxf
  • File details: 39 MB, 72,677 entities, 151 layers (33 HVAC-specific)
  • Furniture DXF HVAC check: ZERO HVAC layers found — furniture layout has NO HVAC data
  • Equipment Map created: HVAC/2026-03-04_v01_HVAC-Equipment-Map.md
  • Key findings:
    • 33 HVAC-specific layers identified (ductwork, equipment, distribution, piping, annotations)
    • 4 primary indoor VRF units near B3 yellow zone (blocks *U370, *U371, *U328, *U380)
    • 6+ air devices (diffusers/grilles) on VI-AIR DEVICES layer in B3 area
    • Plenum boxes exist on MECH-Blenum Box Supply layer (note: "Blenum" typo in DXF)
    • Coordinate systems differ between DXFs (furniture: meters, HVAC: millimeters)
    • Plenum box sizing calculated: 36×36 cm to 50×50 cm face area needed for ≤ 1.5 m/s
    • Silencer constraint: duct sizes ≤ 250 mm fit in 60 cm ceiling; ≥ 300 mm do NOT fit vertically
    • NC budget breakdown: HVAC must achieve NC-10 to NC-12 per duct run for NC-15 total in VO room
  • Strategy confirmed: "Work with what we have" — keep existing VRF system, only modify last-mile delivery with oversized drops and expanded acoustic plenum boxes
  • Status: COMPLETE — Equipment map ready for use in Phase 3 calculations

[2026-03-04 06:45] — B3 Zone Map + Gemini Data Package

  • Files created:
    • HVAC/2026-03-04_v01_B3-Zone-Map-HVAC.html — Scale 1:50 SVG map with zone boundary, columns, HVAC overlay, dimension lines, data tables
    • HVAC/2026-03-04_v01_Zone-Numbers-For-Gemini.md — Clean data file with all dimensions, column positions, VRF locations, width-at-every-level table
  • Coordinate mapping established: HVAC_X = Furniture_X × 1000 + 203,000 (mm offset)
  • Critical finding: Only 1 indoor unit (U380) inside/near yellow zone (SE corner). U370/U371 serve adjacent area ~2.7m east. Most diffusers are OUTSIDE zone to the west.
  • Width formula derived: Width = 7.37 - (Y/4.31) × 1.22 (meters, Y from south wall)
  • Purpose: Cross-session data package for Gemini to lock zone layouts with precise geometry
  • Status: COMPLETE — Ready for Gemini upload

[2026-03-04 07:00] — Full Project Audit (Continued Session)

  • Action: Comprehensive audit of entire project folder per user request
  • Files moved: 4 root files relocated to Source/ with proper naming (2 PNGs, 2 DXFs)
  • PROJECT-INDEX updated: Added HVAC section (4 file links), fixed Source convention note
  • Stale data identified:
    • Locked Scope v01: 6 outdated values (ceiling 290→350, NC-20→NC-25, Samsung→Daikin, buffer spine)
    • Phase 1 Report: Volume calc uses old 2.9m ceiling
    • Area Calculation: Volume calc uses old 2.9m ceiling
  • Reports created:
    • LOG/2026-03-04_Session-Log.md — Full session timeline with file inventory
    • LOG/2026-03-04_Audit-Report.md — Comprehensive audit findings and recommendations
  • Conclusion: Project foundation sound; Scope v02 needed with corrections; Phase 2 Q1-Q6 answers blocking progress
  • Status: COMPLETE

[2026-03-04 08:00] — Phase 02 Reference Files Organized

  • Action: Created Prompts for Reference/Phase 02/ with 12 reference files
  • Files copied:
    • Grok.html — copied from Desktop
    • Gemini.html — copied from Desktop
    • Gemini Report.html — copied from Desktop
    • chatgpt.txt — created with ChatGPT Phase 2 progress report content
    • 6 HTML files extracted from Claude Web Phase 2.zip (Design Briefs v1/v2, HVAC Log, Progress Report, Questions, Briefing Report)
    • Grok.txt — pre-existing
  • Status: COMPLETE

[2026-03-04 08:00] — MediaVerse Dimensioned PDF Archived

  • Source: MediaVerse.pdf (user-provided dimensioned floor plan)
  • Archived to: Source/2026-03-04_MediaVerse-Dimensions-Corrected.pdf
  • Key finding: North wall clearly shows 860 cm, confirming room WIDENS going north
  • Status: ARCHIVED — AUTHORITATIVE source for all geometry

[2026-03-04 08:15] — CRITICAL GEOMETRY CORRECTION: North Wall 860 cm

Corrections applied:

Parameterv01 (WRONG)v02 (CORRECT)Change
North wall614.8 cm860 cm+245.2 cm
NW corner X+1.22 m-1.23 mReversed direction
Gross area29.13 m²34.42 m²+18.2%
Raw volume101.9 m³120.5 m³+18.2%
Effective volume91.8 m³108.4 m³+18.1%
Width formulaW = 7.37 - (Y/4.31)×1.22W = 7.37 + (Y/4.31)×1.23Sign reversed

Additional corrections in Scope v02:

[2026-03-04 08:15] v02 — Corrected Area Calculation

  • File: Calculations/2026-03-04_v02_Area-Calculation.md
  • Author: Claude (Opus 4.6)
  • Action: Complete rewrite with corrected geometry
  • Verification: Both trapezoid formula AND shoelace formula give 344,153.5 cm² = 34.42 m²
  • Status: LOCKED SSOT

[2026-03-04 08:15] v02 — Corrected Locked Scope

  • File: Scope/2026-03-04_v02_Locked-Scope.html
  • Author: Claude (Opus 4.6)
  • Action: All 7 corrections applied with blue "v02 CORRECTION" banner
  • Sections updated: Geometry (§2), Zones (§3), HVAC (§5), Buffer spine (§9), new Change Log (§12)
  • Status: DELIVERED — Supersedes v01

[2026-03-04 08:15] v02 — Corrected Gemini Data Package

  • File: HVAC/2026-03-04_v02_Zone-Numbers-For-Gemini.md
  • Author: Claude (Opus 4.6)
  • Action: All dimensions corrected, ASCII trapezoid updated, width formula sign corrected
  • Status: COMPLETE — Ready for Gemini upload

[2026-03-04 08:30] v02 — Corrected HVAC Zone Map

  • File: HVAC/2026-03-04_v02_B3-Zone-Map-HVAC.html
  • Author: Claude (Opus 4.6)
  • Action: SVG trapezoid redrawn with NW corner extending WEST of SW corner
  • Changes: NW vertex at SVG (127,149) instead of (272,149), north wall labeled 8.60m, area labeled 34.42 m², all data tables corrected, correction banner added
  • Status: COMPLETE — Supersedes v01

[2026-03-04 08:30] — SSOT Geometry File Created

  • File: SSOT-GEOMETRY.md (root level)
  • Author: Claude (Opus 4.6)
  • Action: Created permanent Single Source of Truth file with all locked dimensions
  • Contents: Wall measurements, vertex coordinates, diagonal verification, area/volume, width formula with table, column positions, key project parameters
  • Purpose: "NEVER DEVIATE" reference per user instruction — all future calculations must use these values
  • Status: LOCKED

[2026-03-04 08:30] — PROJECT-INDEX Updated for v02

  • Action: Updated all file links to point to v02 versions, v01 files shown as superseded (grayed out), added SSOT-GEOMETRY.md link under Scope section
  • Status: COMPLETE

[2026-03-04 09:00] — New Authoritative DXF Received

  • Source: User provided latest DXF file as THE authoritative geometry source
  • Archived to: Source/2026-03-04_Final-Layouts-04-03-2026.dxf
  • Cross-ref: Source/2026-03-04_MediaVerse-Reference.png (dimensioned plan showing column visibility)
  • Action: Full DXF extraction and parsing of all geometry values
  • Key finding: Column positions significantly different from v02 PDF-derived estimates

[2026-03-04 09:15] — DXF Extraction Report Created

  • File: Source/2026-03-04_DXF-Extraction-Report.md
  • Author: Claude (Opus 4.6)
  • Action: Comprehensive DXF analysis covering wall vertices, column polylines, HVAC unit positions, coordinate mapping
  • Key findings:
    • COL-WEST center: (3.95, 1.36) → (2.54, 1.36) — 1.41m further west than v02 estimate
    • COL-EAST center: (~7.10, 1.36) → (6.47, 1.33) — confirmed 60x55cm (not ~55x50)
    • COL-EAST partially extends into east wall (60cm showing)
    • Clear span between columns: 333 cm (DXF-verified)
    • Zone geometry (walls, area, volume) UNCHANGED from v02
  • Status: COMPLETE

[2026-03-04 09:15] — SSOT-GEOMETRY.md Updated with DXF-Verified Columns

  • File: SSOT-GEOMETRY.md
  • Action: Column section updated with DXF-verified positions
  • Changes: COL-1/COL-2 renamed to COL-WEST/COL-EAST, all face coordinates updated, span values corrected
  • Status: LOCKED

[2026-03-04 09:30] v03 — DXF-Verified Gemini/Grok Data Package

  • File: HVAC/2026-03-04_v03_Zone-Numbers-For-Gemini.md
  • Author: Claude (Opus 4.6)
  • Action: Created v03 with DXF-verified column positions, renamed COL-WEST/COL-EAST
  • Status: COMPLETE — Supersedes v02

[2026-03-04 09:45] — Full Project Audit Against DXF Values

  • Action: Grep search across entire project for old column values (3.95, 7.10, ~55x50, COL-1, COL-2)
  • Files found with stale values: 5 current files (Area Calc v02, Scope v02, Phase-1 v02, Phase-2 v02, HVAC Zone Map v02)
  • Files confirmed clean: SSOT-GEOMETRY.md, v03 Gemini data, DXF Extraction Report
  • Files excluded (historical, no changes needed): All v01 files, LOG/Audit-Report, Prompts for Reference/
  • Status: COMPLETE — All 5 files identified for v03 upgrade

[2026-03-04 10:00] v03 — DXF-Verified Area Calculation

  • File: Calculations/2026-03-04_v03_Area-Calculation.md
  • Author: Claude (Opus 4.6)
  • Action: Updated column section with DXF-verified positions and face coordinates
  • Changes: COL-WEST center (2.54, 1.36) 60x50, COL-EAST center (6.47, 1.33) 60x55, clear span 333cm
  • Status: LOCKED SSOT — Supersedes v02

[2026-03-04 10:00] v03 — DXF-Verified Locked Scope

  • File: Scope/2026-03-04_v03_Locked-Scope.html
  • Author: Claude (Opus 4.6)
  • Action: Updated column text with DXF-verified positions
  • Status: DELIVERED — Supersedes v02

[2026-03-04 10:15] v03 — DXF-Verified Phase 1 Geometry Report

  • File: Reports/2026-03-04_v03_Phase-1-Geometry-Report.html
  • Author: Claude (Opus 4.6)
  • Action: SVG column rectangles repositioned to DXF-verified coordinates
  • SVG changes: COL-WEST rect at (345,343), COL-EAST rect at (679,344) with correct sizes
  • Status: COMPLETE — Supersedes v02

[2026-03-04 10:15] v03 — DXF-Verified Phase 2 Layout Options

  • File: Reports/2026-03-04_v03_Phase-2-Layout-Options.html
  • Author: Claude (Opus 4.6)
  • Action: All 4 SVG diagrams (geometry ref + Options A, B, C) updated with DXF-verified column positions
  • SVG changes: COL-WEST rect at (379,300) 60x50, COL-EAST rect at (772,301) 60x55 (100px/m scale)
  • Status: COMPLETE — Supersedes v02

[2026-03-04 10:30] v03 — DXF-Verified HVAC Zone Map

  • File: HVAC/2026-03-04_v03_B3-Zone-Map-HVAC.html
  • Author: Claude (Opus 4.6)
  • Action: SVG column rectangles, data table, and correction banner all updated with DXF-verified values
  • SVG changes: COL-WEST rect at (474,419) 60x50, COL-EAST rect at (867,419) 60x55 (100px/m scale, SW at 250,580)
  • Data table: Face coordinates, clear span 333cm, center-to-center 393cm
  • Status: COMPLETE — Supersedes v02

[2026-03-04 10:30] — PROJECT-INDEX Updated for v03

  • Action: Added v03 file links with green DXF-VERIFIED badges, v02 files shown as superseded, added Source Data section with DXF/PNG/Extraction Report links
  • Status: COMPLETE

[2026-03-04 10:30] — COLUMN POSITION CORRECTION SUMMARY

Parameterv02 (PDF estimate)v03 (DXF-verified)Change
COL-WEST center X3.95 m2.54 m-1.41 m (further west)
COL-WEST center Y1.36 m1.36 mNo change
COL-WEST size60×50 cm60×50 cmNo change
COL-EAST center X~7.10 m6.47 m-0.63 m (further west)
COL-EAST center Y~1.36 m1.33 m-3 cm
COL-EAST size~55×50 cm60×55 cm+5cm E-W, +5cm N-S
Clear span~2.57 m (est)3.33 m+76 cm wider
Column namingCOL-1, COL-2COL-WEST, COL-EASTClarified

Impact: Column positions affect layout planning (room partition placement around columns). The wider 333cm clear span between columns gives MORE usable space for room divisions. COL-EAST partially extending into the east wall is consistent with the reference PNG showing partial column visibility.

All v03 files verified clean: No remaining references to old column values (3.95, 7.10, ~55x50, COL-1, COL-2) in any current v03 file.


[2026-03-04 11:00] — CRITICAL COLUMN POSITION CORRECTION: DXF → PNG-VERIFIED

Correction Summary

ParameterDXF-extracted (WRONG)PNG-verified (CORRECT)Shift
COL-WEST center X2.54 m3.64 m+71 cm then +39 cm east
COL-WEST W face224 cm334 cm+71 cm then +39 cm east
COL-WEST E face284 cm394 cm+71 cm then +39 cm east
COL-EAST center X6.47 m7.57 m+71 cm then +39 cm east
COL-EAST W face617 cm727 cm+71 cm then +39 cm east
COL-EAST E face677 cm787 cm+71 cm then +39 cm east
COL-EAST to east wall60 cm gap50 cm past (embedded)COL-EAST partially IN wall
COL-EAST visible inside60 cm~10 cmPartially embedded

Files Updated (DXF-VERIFIED → PNG-VERIFIED)

FileChanges
SSOT-GEOMETRY.mdColumn positions table, header, footer note
HVAC/2026-03-04_v03_B3-Zone-Map-HVAC.htmlSVG columns, correction banner, data table, footer
Reports/2026-03-04_v03_Phase-2-Layout-Options.htmlAll 4 SVGs (geometry + Options A/B/C), title, version tags
Reports/2026-03-04_v03_Phase-1-Geometry-Report.htmlSVG columns, data table, F4 finding, Q2 answer, title, stamp
Calculations/2026-03-04_v03_Area-Calculation.mdColumn section, comparison table, footer
Scope/2026-03-04_v03_Locked-Scope.htmlTitle, structural section
HVAC/2026-03-04_v03_Zone-Numbers-For-Gemini.mdHeader, column tables, span summary, copy-paste block
Source/2026-03-04_DXF-Extraction-Report.mdAdded prominent correction warning, updated cross-reference table, footer