LOCKED SCOPE DOCUMENT

v01 2026-03-04 PHASE 1 Project: TechTown Acoustics 2.0 — MediaVerse Studio Complex, B3 Damascus

1. Project Identity

ProjectMediaVerse Acoustic Studio Complex
LocationTechTown Damascus, Basement Level 3 (B3)
ZoneYellow-highlighted area — Northwest corner of B3
Version2.0 (fresh start — v1.0 abandoned due to cross-LLM context loss)
DesignerThreefold Studio (architecture) + Obai (acoustic engineering)
Acoustic EngineerClaude Opus 4.6 (computational) under Obai's direction
Design StandardConservative / Broadcast-grade (highest tier)

2. Scope Boundary — CRITICAL

ONLY the yellow-highlighted zone in B3.png. NOT the full northwest trapezoid (~92 m² from Grok Session 2). NOT the 13-zone full floor analysis (Claude Web).
Outer boundary area~29–35 m² (independent calculation pending DXF polygon verification)
Usable interior (after construction)~24–28 m² estimated
Ceiling height290 cm (floor to T-bar grid)
Effective height (after treatment)~260 cm (floating floor -15cm, ceiling -15cm)
Volume (outer)~84–101 m³
Volume (usable)~62–73 m³
Area discrepancy exists between sources: 26.75 m² (Claude Web) / ~29 m² (our calc) / ~33 m² (ChatGPT) / 37 m² (scope brief) / 39.5 m² (Grok). Our independent calculation from B3.png gives ~29.1 m² interior trapezoid. Differences likely due to wall thickness inclusion, boundary interpretation, and measurement reference points. This will be resolved in Phase 1 Geometry Report.

3. Room Program — 4 Separate Spaces

4 SEPARATE rooms. Live Room and Video/Podcast Studio are NOT combined/convertible. This was explicitly corrected by the user during Grok Session 2.
RoomFunctionNC TargetRT60 TargetSTC TargetPriority
Voice-Over / Live RoomVO recording, voiceover, instrument trackingNC-150.2–0.3sSTC-60+CRITICAL
Control RoomMixing, monitoring, session controlNC-200.3–0.4sSTC-55+CRITICAL
Video / Podcast StudioGreen screen shoots, podcast recording (2-3 people)NC-200.3–0.5sSTC-50+HIGH
Editing Area4 workstations, headphone-only monitoringNC-300.4–0.6sSTC-40+MODERATE
Sound Lock / VestibuleDouble-door entry from south corridorNC-35N/ASTC-45+HIGH

Sight Line Requirements

RelationshipRequirement
Control Room → Live RoomMUST have direct visual sight line (observation window)
Control Room → Video/Podcast StudioNICE-TO-HAVE — secondary window or CCTV acceptable

4. Physical Constraints

Structural

ElementDetail
Foundation columns2 non-removable columns within the zone:
COL-1: 60 × 50 cm (center of zone at column row)
COL-2: ~55 × 50 cm (near east wall, same row)
Column row position111 cm from south wall, 270 cm from north wall
Internal partitionsALL demolished — full demolition confirmed

Wall Types & Isolation

WallTypeInherent STCThreat LevelNotes
NorthConcrete (exterior)STC-55+LOWFree mass — minimal additional treatment
EastGypsum (10 cm) to Server Room B313STC-25–30CRITICALHighest isolation priority. Server noise 55-65 dB(A) assumed worst-case
West/NWSlanted concrete (exterior facade)STC-55+MEDIUMFree mass, BUT VR Lab vibration risk from adjacent space
SouthInternal partition (to be rebuilt)TBDHIGHEntry side — sound lock required

Construction Constraints (Syria-specific)

5. HVAC System

SystemSamsung DVM VRF (Variable Refrigerant Flow) — CANNOT be changed
Indoor unitsAVD (ducted), AVBC (cassette), AUD (AHU)
Duct sizes (existing)150×100 mm through 500×250 mm rectangular; 150Ø–350Ø round
Known risk150×100 mm ducts may generate excessive velocity noise (regenerated noise)
MitigationSilencer schedule required; potential duct upsizing; flex connections; lined plenums

Key HVAC DXF layers: Duct, MECH-Supply Duct, MECH-RETURN DUCT, MECH-EXHAUST DUCT, MECH-Indoor unit, VI-AIR DEVICES, FLEXIBLE-DUCT

6. Acoustic Construction Specifications

ElementSpecificationApplies To
Room-within-a-room (box-in-box)Full decoupled shell constructionVO / Live Room (mandatory)
Floating floorNeoprene pads, f0 < 20 Hz targetVO / Live Room (mandatory)
Decoupled ceilingResilient hangers / spring isolatorsVO / Live Room (mandatory)
Mass-Air-Mass wallsDouble leaf with air gap, resonance below 50 HzAll studio walls
Observation windowsTriple-pane, angled 5°, different thicknessesControl Room walls
Acoustic doorsSTC-50+ rated, gasket sealedAll room entries
Green screenMotorized retractable (NOT permanent cyclorama)Video/Podcast Studio

7. Assumptions (Worst-Case)

ParameterAssumed ValueRationale
Server room noise (B313)55–65 dB(A)No measured data available — assume worst-case rack servers
Facade glazingSingle-pane float glass (worst STC)Glazing type unknown
Adjacent VR Lab vibrationPresent — structure-borneVR Lab west of the angled wall may generate low-frequency vibration
HVAC background noisePer Samsung DVM specs + regenerated noise calcNeed to verify duct velocities for NC contribution

8. Deliverables Checklist

#DeliverableFormatStatus
D1Full acoustic engineering calculations (RT60, NC, STC, modal analysis, Schroeder freq)HTML + PDFPending
D2Contractor-ready DXF drawings with layer structureDXFPending
D3Material BOM with local Syrian sources + import alternativesHTML + CSVPending
D4Interactive HTML review tool (layer toggles, specs)HTMLPending
D5HVAC noise mitigation plan with silencer scheduleHTML + DXFPending
D6Installation sequence / phasing document for contractorHTMLPending
D7Construction how-to guides: doors, windows, ceiling, walls, floors — per area, with charts and drawn multi-step instructionsHTML + SVG/PNGPending

9. Support Features

FeatureStatusNotes
South entrance sound lock / vestibuleCONFIRMEDIn agreed facts — double-door airlock entry
Buffer spine / service corridorNOT SELECTEDUser did not check this option. May revisit during layout phase if space permits.

10. Occupancy & Operations

ParameterValue
Simultaneous occupancy4–6 people (2–3 editing + 2–3 in studio/control)
Editing stations4 workstations, headphones exclusively
Green screen typeMotorized retractable
Camera throw (video studio)~4.5 m depth target

11. Standards & References

12. Sign-Off

This scope document is LOCKED as of 2026-03-04. Any changes require a new versioned scope document (v02+) with change justification logged in CHANGELOG.